Radial Steps: Getting started


On Wednesday I built the riser for the first step, seen here. It was a warm enough day, but only ten percent of my stone was visible; the rest still covered by snow. These steps are structural, meaning they’re stone all the way through; there’s no block or concrete, except for the slab underneath it all. They will extend almost all the way to the cut bank. These steps and attached columns are mortared. The adjacent retaining walls will be drystone.

Tread for bottom step

I spent Thursday in the shop, seen below, fabricating these tread stones for the bottom step. As with the Eight Leaves project I made paper, then roofing felt templates. The paper templates for this step are taped to the wall behind the saw. The roofing felt templates are piled on the table. This time I used my seven inch grinder instead of the five inch. These radii are more gentle on these steps and the bigger blade made it easier to get through cleanly. The downside is that the bigger grinder kicks like a mule when the blade catches.